Engineering

Get documented
engineering

Heat tracing engineering ensures that heating cables, accessories, controls, insulation and documentation are aligned from the start. This is especially important for larger systems, critical processes, ATEX areas or installations where frost, temperature loss or incorrect installation can lead to downtime.

At Newtronic, we assist with consultancy, on-site inspection, sizing and documented engineering of heating cable systems. We can prepare a complete engineering package with calculations, circuit segmentation, bills of materials and any isometric drawings, providing the installation with a solid technical basis.

Torben projektere

Approvals

We always work in accordance with applicable approvals and standards
Newtronic is food-approved
Food-approved
Solutions for hygiene- and process-critical environments
Norsok
NORSOK-compliant solutions
Solutions tailored to the requirements of the Norwegian offshore industry
ATEX marking for explosive atmospheres
ATEX-approved solutions
Approvals for explosive atmospheres in the EU
IECEx
IECEx-certified
International certification for hazardous areas
CE mark for EU conformity
CE
CE-marked products for the European market
DNV certification
DNV
Approvals for marine and offshore applications
Lloyd’s certified
Lloyd’s Register
Type approvals for marine and offshore
UL and CSA certification logos
UL / CSA
Approvals for the North American market

Heat tracing engineering provides a reliable basis for decision-making

Heat tracing engineering is about ensuring that the heating cable system is sized correctly before installation begins. This applies to freeze protection, temperature maintenance and process heating, where incorrect cable selection, insufficient output or inadequate control can have a direct impact on operations.

A heat tracing system rarely consists of just a heating cable. Pipe diameter, insulation, ambient temperature, medium, target temperature, circuit lengths, installation conditions, accessories, controls and documentation must all align. Clarifying these factors early makes it easier to choose the right solution and avoid errors later in the project.

From initial consultancy to complete project documentation

At Newtronic, engineering often begins with a technical dialogue about the system’s function. Here, we clarify whether the purpose is freeze protection, temperature maintenance, start-up assistance or process heating. We then assess the data that is relevant to the solution.

This may include pipe dimensions, pipe materials, insulation thicknesses, minimum ambient temperature, required maintenance temperature, medium properties, voltage level, control requirements and any safety or documentation requirements.

If required, we also carry out an on-site inspection. This may be relevant if the system already exists, if the drawing basis is insufficient, or if the installation has complex pipe routing, valves, flanges, tanks or measurement points that require special assessment.

Engineering for freeze protection

Freeze protection is one of the most common reasons to engineer heat tracing. The solution must ensure that pipes, valves, instrumentation or technical equipment are kept frost-free, even when the system is shut down or exposed to low outdoor temperatures.

A correctly engineered freeze protection solution accounts for heat loss, insulation, pipe routing, critical points and control. This is especially important for outdoor installations, utility plants, process lines, sprinkler systems, water pipes and technical installations, where frost damage can cause leaks, downtime and unnecessary service costs.

Engineering for temperature maintenance

For temperature maintenance, requirements are often more process-critical. Here, it is not only about avoiding frost, but about maintaining a medium at a required temperature through pipes, tanks or equipment.

This may be relevant for media such as sugary liquids, syrup, molasses, fats, oil, chemical liquids or other products that can crystallise, become too viscous, solidify or create deposits when the temperature drops.

In these applications, the engineering must ensure that heating cables, insulation, sensor placement and controls work together. The goal is stable temperature, better process control and a lower risk of blockages or operational disruptions.

Documented engineering and isometric drawings

For larger heat tracing projects, documentation is an important part of the delivery. An engineering package may include output calculations, selection of cable type, circuit segmentation, cable lengths, bills of materials, accessories, control principles and technical documentation.

If required, we can also prepare isometric drawings, giving installation a clear basis for where heating cables, connections, joints, sensors and terminations should be placed. This makes installation more straightforward and reduces the risk of on-site errors.

Engineering for ATEX and demanding environments

In ATEX areas and demanding industrial environments, heat tracing engineering must be carried out with extra attention. Here, cable type, temperature limitation, controls, accessories, insulation, installation and documentation must be assessed as a whole.

It is not enough to select a heating cable based on temperature and output alone. Zone classification, temperature class, surface temperature, component selection and the installation build-up must align. Therefore, we recommend involving Newtronic early in projects where safety, documentation and reliability are critical.

A better basis for installation and service

Well-documented engineering makes it easier to install, commission and service a heating cable system. Installers get a clearer basis, operations staff get a better overview, and service becomes easier because circuits, components and technical choices are documented.

This is especially valuable for systems with many heating circuits, critical process lines or installations that later need to be expanded, serviced or fault-traced. When the engineering is in place from the start, the entire heat tracing solution becomes more manageable.

Get help with heat tracing engineering

Do you need heat tracing engineering for freeze protection, temperature maintenance or process heating? Contact Newtronic early in the project.

We provide consultancy, on-site inspection, calculations, cable selection, circuit segmentation, documentation and any isometric drawings, ensuring that the heating cable system is sized correctly from the start.

Newtronics teknikere samarbejder om at finde den rigtige løsning
Newtronics tekniske team hjælper dig
Det var en klar fordel, at Newtronic kunne projektere varmekabelløsningen ud fra 3D-tegningerne af anlægget. Det betød, at vi allerede inden installationen havde et godt overblik over løsningen, kabelføringen og de områder, der krævede særlig opmærksomhed.
Claus Hansen, HS-Tec ApS

Most frequently
asked questions

Heat tracing design typically includes calculating the heat requirement, selecting the heating cable, circuit lengths, supply points, temperature control, and required accessories. In addition, the installation environment, insulation, safety, and documentation requirements are assessed to ensure the solution fits the specific installation.

We typically need to know pipe dimensions, pipe lengths, medium, required maintenance temperature, lowest ambient temperature, and insulation type and thickness. P&IDs, isometrics, pipe lists and other project drawings can be used as a basis when the necessary process and installation data are included.

Heat loss depends, among other factors, on pipe dimensions, insulation, the desired pipe temperature, and the lowest ambient temperature. Valves, flanges, supports, and other equipment can cause additional heat loss. The calculated heat demand is then used to select the cable type and output so that the installation can maintain the desired temperature under the design conditions.

In an ATEX zone, the entire heat tracing system must be assessed as a whole. This includes, among other things, zone classification, gas or dust, temperature class, maximum surface temperature, cable type, accessories, control, and installation. The selected solution and documentation must be tailored to the specific installation and the applicable zone requirements.

The documentation depends on the project’s size and requirements, but may include calculations, cable and circuit lists, datasheets, drawings, control philosophies, and relevant certificates. For larger or critical installations, clear documentation is important for installation, commissioning, troubleshooting, and subsequent maintenance.